Skip to content
ZEDA B. Bystrica, s.r.o.
stavebná spoločnosť
ZEDA B. Bystrica, s.r.o.ZEDA B. Bystrica, s.r.o.
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information

Sewer collector A, Bratislava, 1st stage

You are here:
  1. Home
  2. Project
  3. Sewer collector A, Bratislava, 1st…

Sewer collector A, Bratislava, 1st stage

Bratislava, Botanická Street

Investor: BVS a.s., Bratislava

Realised objects:
Sewage collector reconstruction A VIII – section between the inspection chamber Š1 (near the existing inspection chamber Š12 of the original sewage collector) to newly constructed access chamber VŠ4.

Description of realisation:
The above mentioned construction project was the most important order of our company in this area of activities in the period of 2013-2014. The subject of the project was reconstruction of sewage collector A VIII in Botanická street in Bratislava which was realised by building new sewage collector in twin profile 2 x DN 2000 in the section between the inspection chamber Š1 (near the existing inspection chamber Š12 of the original sewage collector) to newly constructed access chamber VŠ4 of total length 2 x 303 metres (1st stage).

Construction technology:
Realisation of the construction was performed mostly by mining procedures and partly in an open excavation pit (length 2 x 25,0 m). The built-in tubes are made of centrifugally cast fibreglass of SN 10 000 toughness. There were 2 atypical monolithic junction chambers, 4 fibreglass check chambers and 1 atypical monolithic downfall chamber built in the section. Shifting of following mains were realised as a part of sewage reconstruction: water main DN 800 in length of 76 metres, water main DN 200 in length of 11 metres, gas main DN 200 in length of 25,5 metres, hot water main 2 x DN 125 in length of 22,0 metres including compensator chamber, tram overhead line and 22 kV electric power line in length of 104,0 metres.

Construction period: August 2013 – December 2014

Rekonštrukcia kanalizačného zberača A VIII. (1) I. etapaRekonštrukcia kanalizačného zberača A VIII. (1) I. etapaRekonštrukcia kanalizačného zberača A VIII. (1) I. etapaRekonštrukcia kanalizačného zberača A VIII. (1) I. etapaRekonštrukcia kanalizačného zberača A VIII. (1) I. etapaRekonštrukcia kanalizačného zberača A VIII. (1) I. etapa
Headquarters

TUBAU, a.s.
Pribylinská 12
831 04 Bratislava
SLOVAK REPUBLIC

Contact information

ZA tel.: +421 41 723 55 85
BA tel.: +421 2 49 11 53 50
email: tubau@demo.zedabbystrica.sk
email: zakladania@demo.zedabbystrica.sk

ZEDA B. Bystrica, s.r.o.
©2023 ZEDA B. BYSTRICA, s.r.o. | Personal Data Protection
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information
Menu
Go to Top
Vyjadrite prosím svoj súhlas s Ochranou osobných údajov na tomto webe kliknutím na tlačidlo "Súhlasím".
Prečítajte si, ako nakladá tento web s osobnými údajmi. Dozviete sa okrem iného o cookies. Súhlasím
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Vždy zapnuté
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
ULOŽIŤ A PRIJAŤ