Skip to content
ZEDA B. Bystrica, s.r.o.
stavebná spoločnosť
ZEDA B. Bystrica, s.r.o.ZEDA B. Bystrica, s.r.o.
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information

Tunnel Šibenik

You are here:
  1. Home
  2. Project
  3. Tunnel Šibenik

Tunnel Šibenik

D1 highway Jánovce- Jablonov, 2nd section, Levoča

Name of the construction: D1 highway Jánovce- Jablonov, 2nd section, Tunnel Šibenik

Location: Levoča, Construction object: SO 401-00 Tunnel Šibeník

Investor: Národná diaľničná spoločnosť, a.s. Mlynské nivy 45, 821 09 Bratislava

Contractor: “Association EUROVIA – SMS – D1 Jánovce – Jablonov, 2nd section“

Tunnel Šibeník main constructor: TUBAU, a.s. Pribylinská 12, 831 04 Bratislava

Realised works:
The work of tunnel contractor (TUBAU, a.s.) consisted of realisation of SO 401 objects group (Tunnel Šibeník). The tunnel Šibeník is one of the first constructions of this kind in Slovakia realised in “yellow FIDIC” contractual system.
TUBAU Company realised complex construction of the tunnel. The tunnel is realised as rural zone twin tube highway tunnel with one way traffic and 100 km per hour speed limit of the category 2T-8,0. The length of each tunnel tube is 588 metres, out of which 540 metres is the length of tunnelled section in each individual tube. The tunnel tubes are mutually connected with one passable cross interconnection. The whole project consists of 15 construction objects and 18 technological objects.
Tunnelling works were realised by NRTM method using blasting. Secondary lining consisted of 91 blocks in both tunnel tubes out of which 47 blocks were reinforced and 44 blocks were not reinforced.
The integral part of Tunnel Šibeník construction was the delivery and installation of technological equipment of the tunnel itself.

Tunnel objects technology consists of:
• Technological centre – ventilation technology, heating, wiring and fixed fire extinguishing equipment installation.
• Grounding system of the tunnel objects and the other parts.
• Fire extinguishing water main technological equipment.
• Low and high voltage connections.
• Transformer centre for tunnel, tunnel power connection.
• Building with fire extinguishing water reservoir – installation of ventilation, heating, wiring and technological equipment.
• Tunnel lighting.
• Video watching and video detection system in the tunnel.
• Tunnel central control system, traffic control system, and communication system.
• Tunnel ventilation, inner physical parameters measurement.
• SOS chambers
• Electronic fire warning signalisation, electronic security signalisation.

Realised objects:

Construction part:
401-00.11 Western tunnelling portal and building pit
01-00.012 Approach retaining wall and western portal slope terrain works
01-00.21 Eastern tunnelling portal and building pit
01-00.022 Approach retaining wall and Eastern portal slope terrain works
01-00.031 Collectors and duct banks
01-00.032 Excavated tubes
01-00.04 Tunnelled tubes
01-00.05 Cross interconnections
01-00.06 Drive way and sidewalks
01-00.07 Tunnel drainage
01-00.08 Drive way drainage
01-00.09 Fire extinguishing water main
01-00.10 Technological centre
01-00.51 Fire extinguishing water main connection water pipeline
01-00.52 Building with extinguishing water reservoir

Technological part:
401-00.62 Electrical connection for high voltage transformer centre
01-00.63 Low voltage connection for the building with extinguishing water reservoir
01-11.01 Tunnel electricity supply
01-11.02 Tunnel central control system
01-11.03 Traffic control
01-11.041 Video watching and video detection system
01-11.042 Tunnel inner physical parameters measurement
01-11.043 Electronic security signalisation
01-11.044 SOS chambers
01-11.045 Tunnel communication system
01-11.05 Tunnel ventilation
01-11.06 Tunnel lighting
01-11.07 Electronic fire signalisation
01-11.08 Grounding system
01-11.09 Fire extinguishing water main technological equipment
01-11.52 Technological equipment of the building with fire extinguishing water reservoir
01-11.62 Tunnel transformer centre
01-11.63 Back-up electricity source for the building with fire extinguishing water reservoir

Construction period: March 2013 – November 2015

Tunel ŠibenikTunel ŠibenikTunel ŠibenikTunel ŠibenikTunel ŠibenikTunel ŠibenikTunel Šibenik
Headquarters

TUBAU, a.s.
Pribylinská 12
831 04 Bratislava
SLOVAK REPUBLIC

Contact information

ZA tel.: +421 41 723 55 85
BA tel.: +421 2 49 11 53 50
email: tubau@demo.zedabbystrica.sk
email: zakladania@demo.zedabbystrica.sk

ZEDA B. Bystrica, s.r.o.
©2023 ZEDA B. BYSTRICA, s.r.o. | Personal Data Protection
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information
Menu
Go to Top
Vyjadrite prosím svoj súhlas s Ochranou osobných údajov na tomto webe kliknutím na tlačidlo "Súhlasím".
Prečítajte si, ako nakladá tento web s osobnými údajmi. Dozviete sa okrem iného o cookies. Súhlasím
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Vždy zapnuté
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
ULOŽIŤ A PRIJAŤ