Skip to content
ZEDA B. Bystrica, s.r.o.
stavebná spoločnosť
ZEDA B. Bystrica, s.r.o.ZEDA B. Bystrica, s.r.o.
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information

Underground IV. C1 Prague

You are here:
  1. Home
  2. Project
  3. Underground IV. C1 Prague

Underground IV. C1 Prague

Construction of underground IV. C1 Prague (Holešovice – Ládví) – construction part PRAGUE

Client: Dopravný podnik hl. m. Prahy a. s.

Superior Contractor: Subterra a. s., Praha 4 – Braník

Structures description and completed works:
Excavation and primary lining of single-line tunnels from working shaft at site Metro IV. C1.

Completed structures:

  • SO 04-24/01 – Single-line tunnels behind station Kobylisy – LTT – boring a primary lining including connecting gallery between tunnels,
  • SO 04-24/11 – Single-line tunnels behind station – PTT – boring a primary lining,
  • SO 04-24/03 – Single-line tunnels behind station Kobylisy – LTT – final lining,
  • SO 04-24/13 – Single-line tunnels behind station Kobylisy – PTT – final lining,
  • SO 04-21/03 – Double-line tunnel in front of Trojská street at split section,
  • SO 05-21/07 – Single-line tunnels behind station Kobylisy – PTT – boring a primary lining.

Construction technology:

  • boring works performed using NATM method at rock classes equivalent to excavation classes 3,4 and 5a, drilling and blasting works, in two benches – vault and invert in total length of 414 bm,
  • mucking material was loaded by BOBCAT loader to container and carried out to ground by RDK-300 crane through shaft,
  • concrete was carried by gravity-feeding conduit of 225 mm diameter to concrete-pumping machine MAYCO-SUPREMA with accelerator batching,
  • concrete coating was done using ALIVA AL – 503 operator,
  • maximum length of meshing 1,35 m,
  • partition reinforcement M3 + shotcrete B-20 of 200 mm width with 2x wire mesh of 8 x 8/150 x 150 mm,
  • excavation support – needles of 28 mm diameter, 4m length, 8 pcs for each meshing,
  • anchors BOLTEX 8 of 4 m length, 6 pcs for each meshing.

Contract sum: 62,1 mil. SKK

Construction period: April 2002 – April 2003

Stavba metra IV. C1, PrahaStavba metra IV. C1, PrahaStavba metra IV. C1, PrahaStavba metra IV. C1, Praha
Headquarters

TUBAU, a.s.
Pribylinská 12
831 04 Bratislava
SLOVAK REPUBLIC

Contact information

ZA tel.: +421 41 723 55 85
BA tel.: +421 2 49 11 53 50
email: tubau@demo.zedabbystrica.sk
email: zakladania@demo.zedabbystrica.sk

ZEDA B. Bystrica, s.r.o.
©2023 ZEDA B. BYSTRICA, s.r.o. | Personal Data Protection
  • Home
  • Company activities
  • Current projects
    • Tunnels
    • Special foundations
    • Underground structures
  • References
    • Tunnels
    • Special foundations
    • Underground structures
    • Building structures
    • Service activities
  • Certificates
  • Certificates
  • Contact
    • Contact information
Menu
Go to Top
Vyjadrite prosím svoj súhlas s Ochranou osobných údajov na tomto webe kliknutím na tlačidlo "Súhlasím".
Prečítajte si, ako nakladá tento web s osobnými údajmi. Dozviete sa okrem iného o cookies. Súhlasím
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Vždy zapnuté
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
ULOŽIŤ A PRIJAŤ