{"id":991,"date":"2017-06-18T15:05:34","date_gmt":"2017-06-18T13:05:34","guid":{"rendered":"http:\/\/tubau.renad.sk\/?post_type=dt_portfolio&#038;p=991"},"modified":"2017-06-26T14:10:44","modified_gmt":"2017-06-26T12:10:44","slug":"bana-pg-silesia-vystavba-podzemneho-zasobnika-uhlia","status":"publish","type":"dt_portfolio","link":"https:\/\/demo.zedabbystrica.sk\/en\/project\/silesia-mine-construction-of-underground-coal-reservoir\/","title":{"rendered":"Silesia Mine, Construction of underground coal reservoir"},"content":{"rendered":"<section class=\"wpb-content-wrapper\"><p>[vc_row bg_type=&#8221;image&#8221; parallax_style=&#8221;vcpb-default&#8221; bg_image_repeat=&#8221;no-repeat&#8221; bg_image_size=&#8221;initial&#8221; bg_image_posiiton=&#8221;730px 0px&#8221; css=&#8221;.vc_custom_1497250891710{background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221; el_class=&#8221;tubaulogo&#8221;][vc_column][vc_column_text]<\/p>\n<h2>Silesia Mine, Construction of underground coal reservoir<\/h2>\n<h4>Czechowice-Dzedzice, Poland<\/h4>\n<p><strong>Investor:\u00a0<\/strong>Przedsi\u0119biorstwo g\u00f3rnicze \u201eSILESIA\u201c (PG \u201eSILESIA\u201c), Poland<\/p>\n<p><strong>Realised objects:<\/strong><br \/>\nConstruction of the underground reservoir<br \/>\nAccess corridor tunnelling<br \/>\nTransport and ventilation corridor tunnelling<br \/>\n161-wall puncture<\/p>\n<p><strong>Description of realisation:<\/strong><br \/>\nThe reservoir dimensions are: height 55,0 metres, diameter 9,0 metres, and volume 3200 cubic metres. The head of reservoir is located on the horizon IV in the depth of 460 metres and staging device (capacity of 800 tons per hour) on the horizon VI in the depth of 556 metres. The realisation included the works from the underground reservoir project evolvement, building the reservoir up to the handing it over to the user. The reservoir utilises the advanced technologies for data transfer to production dispatching including following the maximal level of coal in the reservoir, loading it onto the conveyer, weighing the broken coal and fire-fighting device. The work and material used in the reservoir were subject to strict safety rules effective in Poland for mines of category IV. with appearance of methane.<\/p>\n<p><strong>Construction technology:<\/strong><br \/>\nThe reservoir construction was realised in required quality in accordance with the project documentation. Tunnelling works were performed as a combination of drilling and blasting with following excavation of broken material. Primary lining was realised by spraying concrete reinforced with two layers of steel net and radial anchors. Consequently, the secondary lining was made of concrete of strength 70-MPa.<\/p>\n<p><strong>Construction period:\u00a0<\/strong>August 2012 \u2013 December 2013[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_empty_space height=&#8221;10px&#8221;][vc_separator color=&#8221;black&#8221; style=&#8221;shadow&#8221;][vc_empty_space height=&#8221;25px&#8221;][vc_column_text]<\/p>\n<div class=\"shortcode-gallery dt-format-gallery gallery-col-4 galleryid-991 dt-gallery-container\" style=\"width: 100%;\"><a href=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-1.jpg\" class=\"rollover rollover-zoom dt-pswp-item big-img layzr-bg\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\"  data-dt-img-description=\"\" data-large_image_width=\"1000\" data-large_image_height = \"561\"><img src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D&#39;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#39;%20viewBox%3D&#39;0%200%20561%20561&#39;%2F%3E\" data-src=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-1-561x561.jpg\" data-srcset=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-1-561x561.jpg 561w\" loading=\"eager\" style=\"--ratio: 561 \/ 561;\" sizes=\"(max-width: 561px) 100vw, 561px\" class=\"preload-me lazy-load aspect\" width=\"561\" height=\"561\"  alt=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" \/><\/a><a href=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-2.jpg\" class=\"rollover rollover-zoom dt-pswp-item layzr-bg\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\"  data-dt-img-description=\"\" data-large_image_width=\"1000\" data-large_image_height = \"750\"><img src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D&#39;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#39;%20viewBox%3D&#39;0%200%20300%20300&#39;%2F%3E\" data-src=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-2-300x300.jpg\" data-srcset=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-2-300x300.jpg 300w, https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-2-600x600.jpg 600w\" loading=\"eager\" style=\"--ratio: 300 \/ 300;\" sizes=\"(max-width: 300px) 100vw, 300px\" class=\"preload-me lazy-load aspect\" width=\"300\" height=\"300\"  alt=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" \/><\/a><a href=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-3.jpg\" class=\"rollover rollover-zoom dt-pswp-item layzr-bg\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\"  data-dt-img-description=\"\" data-large_image_width=\"1000\" data-large_image_height = \"666\"><img src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D&#39;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#39;%20viewBox%3D&#39;0%200%20300%20300&#39;%2F%3E\" data-src=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-3-300x300.jpg\" data-srcset=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-3-300x300.jpg 300w, https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-3-600x600.jpg 600w\" loading=\"eager\" style=\"--ratio: 300 \/ 300;\" sizes=\"(max-width: 300px) 100vw, 300px\" class=\"preload-me lazy-load aspect\" width=\"300\" height=\"300\"  alt=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" \/><\/a><a href=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-4.jpg\" class=\"rollover rollover-zoom dt-pswp-item layzr-bg\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\"  data-dt-img-description=\"\" data-large_image_width=\"1000\" data-large_image_height = \"665\"><img src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D&#39;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#39;%20viewBox%3D&#39;0%200%20300%20300&#39;%2F%3E\" data-src=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-4-300x300.jpg\" data-srcset=\"https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-4-300x300.jpg 300w, https:\/\/demo.zedabbystrica.sk\/wp-content\/uploads\/bana-silesia-podzemny-zasobnik-uhlia-4-600x600.jpg 600w\" loading=\"eager\" style=\"--ratio: 300 \/ 300;\" sizes=\"(max-width: 300px) 100vw, 300px\" class=\"preload-me lazy-load aspect\" width=\"300\" height=\"300\"  alt=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" title=\"Ba\u0148a PG Silesia V\u00fdstavba podzemn\u00e9ho z\u00e1sobn\u00edka uhlia\" \/><\/a><\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>[vc_row bg_type=&#8221;image&#8221; parallax_style=&#8221;vcpb-default&#8221; bg_image_repeat=&#8221;no-repeat&#8221; bg_image_size=&#8221;initial&#8221; bg_image_posiiton=&#8221;730px 0px&#8221; css=&#8221;.vc_custom_1497250891710{background-position: center !important;background-repeat: no-repeat !important;background-size: cover !important;}&#8221; el_class=&#8221;tubaulogo&#8221;][vc_column][vc_column_text] Silesia Mine, Construction of underground&hellip;<\/p>\n","protected":false},"author":1,"featured_media":597,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_links_to":"","_links_to_target":""},"dt_portfolio_category":[18,29],"dt_portfolio_tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/dt_portfolio\/991"}],"collection":[{"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/dt_portfolio"}],"about":[{"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/types\/dt_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/comments?post=991"}],"version-history":[{"count":0,"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/dt_portfolio\/991\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/media\/597"}],"wp:attachment":[{"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/media?parent=991"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/dt_portfolio_category?post=991"},{"taxonomy":"dt_portfolio_tags","embeddable":true,"href":"https:\/\/demo.zedabbystrica.sk\/en\/wp-json\/wp\/v2\/dt_portfolio_tags?post=991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}